Trusted Excellence
in Contracting
All-in-One
Construction
Building Tomorrow, Today
Since 2010
Introduction
It is with great pride and pleasure that we introduce our Company “CITY BRIDGE GENERAL CONTRACTING” to your kind attention. “CBGC” one of our renowned and prestigious ventures was established in 2010.The company has now grown in infrastructural development in the field of vast numbers of projects in different zones, Our company worked all kind of Infrastrucrure project , MEP construction activities including steel and concrete concrete foundations installation as well qualified team on ground. Timely and prompt services quality of our machineries, vehicles, materials, manpower and the speed of our deliveries, and efficient staffs have earned us the highest recognition and recommendation of our satisfied clients. We are glad to offer you our best quality machineries, equipment’s, materials and services as and when required and undertake the ultimate goal of satisfying the best of your expectations at all times. With a reputation for “CBGC” services which cover planning, design, procurement, installation, testing, commissioning and documentation in providing quality services and securing customer satisfaction through continuous development. The Company is comprised of highly qualified staff, chosen for their vast experience and outstanding achievements, and is using computer aided design software in preparing design & drawings
Our Classification & Scope Of Work
General Construction
We deliver reliable general construction services including structural works, villas, and excavations, with a strong commitment to quality and safety.
Infrastructure / MEP Works
We provide integrated infrastructure and MEP solutions covering drainage, cabling, and electro-mechanical systems, executed to approved standards.
Mission Statement
Methodology
Delivered from the above statement, CITY BRIDGE GENERAL CONTRACTING adopted the following procedures to assure our Client’s the best quality of the work and value for money.
Specification Compliance
We at CITY BRIDGE GENERAL CONTRACTING feel that one of the most vitally important issues that affect the quality of services provided is the thorough understanding of the client’s and/or consultant’s requirements. These requirements are then analyzed, and acted upon respectively.
Drawing and Design Charge
Once drawings are received a numbering system will be adopted and assigned to each and every drawing. This procedure ensures that all drawings are easily differentiated and all updated drawings are directly forwarded to the concerned staff. Moreover, this procedure guarantees that the carried-out works are performed in accordance with the latest drawings hence ensuring the interpretation and inclusions of all alternations. Before the final drawing and specifications are being forwarded to the supplier and orders are made. CITY BRIDGE GENERAL CONTRACTING always allows for client’s and / or consultant’s final revision and approval, eliminating any possible dispute that might arise due to last minute alternation.
Procurement Control
Following the finalization of drawing and specifications approvals, the suppliers/ manufacturers will be contacted to submit their quotations and reference. These quotations will be analyzed and subjected to a detailed comprehensive study to select the best supplier/manufacturer that meets the final accepted specifications. Following which, the procurement documents are updated and filled accordingly. Copies of the same will be sent to the client/consultant for their review and final approval. Finally, firm orders are placed with the supplier/manufacturer that meet the intended scope
Factory Test
Manufacturer / supplier are asked to do routine tests at their factory to ensure safe and proper operation of the material/equipment. Third party (independent) inspection agencies will be hired to witness or performed the required testing and issue their approval certificates.
Control of Material Reception, Storage and Handling
Before storing the material, all shipment documents will be crosschecked with the corresponding order to ensure their compliance with the individual requirements. Following which, the material will be properly marked according to their quality, purchasing documents and characteristics. Defective material will be clearly marked and identified. Storage and handling of the material will be performed in manner that maintains their identification and accessibility. Periodic inspections are carried-out to check the materials status.
Inspection / Installation
After the completion of each installation phase, a thorough inspection will be performed to see whether it complies with the drawings and applicable standard. Any notices defect or discrepancies will be recorded and corrected at the earliest.
Final Test / Inspection
All equipment and materials will be tested as per the manufacturer’s standard instructions and their corresponding performance data will be recorded. The results will be forwarded to the client / consultant for their verification and approval. A copy of the test results will be forwarded to the manufacturer, as well, to cross check with the design performance. The final test and inspections will be accomplished according to a predetermined and agreed procedure that indicates the date, objected, involved parties and others. The results will then be furnished to all concerned parties including the supplier.
Documentation
Following Project completion necessary copies of as built drawings, test results, agreed upon specifications, approved alterations and others, will be documented and forwarded to the client/consultant for their reference and records. In particular cases, photographs and microfilms will be produce and kept as records for future references. All documents record saved for record; therefore, documentation work will be done professionally.
Featured Projects
- Project # 1
- Project # 2
- Project # 3
- Project # 4
- Project # 5
- Project # 6
- Project # 7
Scope of Work
Storm water Installation, MH construction, Gully Chambers, Demolition works, Earth works, Concrete works, Kerb stone fixing & paving, walk way.
Scope of Work
Major Sewerage line, earth work, chambers, connections to existing network, road crossings, testing and commissioning, final handing over.
Scope of Work
Earth work, Major construction of Storm water, Sewerage line, Etisalat cable laying, MH’s, Chambers, Road Gullies, Asphalt road work, paving of foot path, Testing and commissioning, Handing over.
Scope of Work
Road works, Earth work Sewerage line including house connections, miscellanies works as sheet pile Chambers, Shaft piling, MH construction, Testing and commissioning, final handing over.
Scope of Work
Operation, Maintenance, and Management of Irrigation, Storm water, Landscapes, road works, gully chambers, MH construction, Cable laying for Communication and power, pull box installation.
Scope of Work
Foot path works / parking area/ storm water gully chambers with pipe line
Scope of Work
Miscellaneous / MH’s /Pipe line / House Connections
Manpower Resources
A greater part of CITY BRIDGE GENERAL CONTRACTING, is working towards the needs of our Clients to produce and deliver better Quality projects. With more than 16 years of experience our Team is working hand-in-hand, with a wide range of qualified and experienced staff with over 150 employees that provide optimum quality service.
| Trade | Numbers |
|---|---|
| Senior Managers | 2 |
| Project Managers | 2 |
| Engineers | 3 |
| Administration | 4 |
| Accountants | 2 |
| Surveyors | 3 |
| Supervisory Staff | 4 |
| Technicians | 10 |
| Operators | 18 |
| Skilled labor | 40 |
| Unskilled labor | 70 |
| Total | 158 |
Plant Resources
| Category | Sub-Category | Make | Qty |
|---|---|---|---|
| Backhoe Loader | - | J.C.B. | 12 |
| Excavator | - | Caterpillar | 3 |
| Wheel Loader | - | Komatsu | 1 |
| Crane | 25 ton | Tadano | 1 |
| Crane | 35 ton | Grove | 1 |
| Bobcat | - | Bobcat | 2 |
| Bus | 29 Person | Tata | 1 |
| Bus | 67 Person | Tata | 1 |
| Diesel Tanker | Diesel Tanker | SCANIA | 1 |
| Dumper | Dumper | Ausa | 1 |
| Mini Bus | 14 Person | Mitsubishi | 1 |
| Mini Bus | 9 Person | Nissan | 1 |
| Pick Up | 3 ton | Mitsubishi | 1 |
| Pick Up | Double Cabin | Toyota | 5 |
| Pick Up | Single Cabin | Nissan | 3 |
| Hiab Crane Truck | 3 ton | Mitsubishi | 1 |
| SUV | Fortuner | Toyota | 2 |
| SUV | Land Cruiser | Toyota | 1 |
| Tipper Truck | Tipper Truck | MAN | 2 |
| Truck w/Crane | Truck w/ Crane | MAN | 2 |
| Water Tanker | Water Tanker | MAN | 1 |
| Tower Crane Water Tanker | Tower Water Tanker-Drinking | Haishan MAN | 2 1 |